Hello, welcome to visit Corbett official website!

Bulletin Board:
Contact Us

ZhongKeBeiTe
Hotline:86-400-6073566
Tel:86-0536-6073566
Fax:86-0536-6073577
E-mail:zcrdbt@126.com
Address:Weifang City, Shandong Province Zhucheng East Outer Ring southern section of northbound Xue Hall
Garbage incinerator
2 张,当前第 1上一张 | 下一张 幻灯播放
垃圾焚烧炉
1 / 2
Product Overview

A product overview:
     Small garbage incinerator, using foreign incineration technology and equipment processing all types of animal carcasses and faeces, medical waste, laboratory of solid waste, the sets of equipment has the following several features:
Excellent design, small size, simple operation, easy maintenance, energy saving, safe and reliable, low cost, long service life. The equipment advanced technology, sophisticated consistent quality, the full realization of the solid waste treatment of "harmless, non quantitative and stability". Is the preferred equipment for all types of farms, livestock farms, veterinary hospital, zoo, laboratory safety treatment of solid waste.
Processing capacity 30-50kg/H
Two, the implementation of standards:
     National Environmental Protection Agency HT/T18-1996 "small incineration pollution control standards".
     1, the use of diesel combustion.
     2, ignition mode: automatic ignition.
     4, running mode: continuous operation.
     5, waste gas treatment method: high temperature + high temperature spray air swirl combustion + two + + cyclone dust collector + chimney.
     6, burning temperature: 600-900 (temperature adjustable)

     7, the furnace pressure: the negative pressure design, no backfire
     8, the design of the average calorific value: 2500Kcal/Kg.
     9, total floor area: 3 m x 3 meters, the equipment covers an area of 2.6m x 1.4m x high 2.8m (floor type chimney)
The simple proof shed.
Three, safety index:

     1 before the operation, the device has a test of the combustion chamber cooling process, so that the combustion chamber temperature is reduced to the set temperature, and the incinerator stops all operations.
     2. The control cabinet and the control device is connected between protection device, so as to avoid the leakage, at 85% relative humidity, electrical circuit insulation resistance not less than 24m Omega, and succession ground transmit leakage power. Metal hose protection on line.
     3 the equipment is verified by the technical department after the factory, the oil circuit, gas road, and other installation is very strong, and after the pressure test, no leakage phenomenon.
     Four, the composition of the incinerator comprises:
     Furnace body, a combustion chamber, a secondary combustion chamber, a cyclone in dust collector, chimney, flue, pipeline system, high pressure blower, Deputy press induced draft fan, a combustion engine, secondary combustion machine, and, electric control cabinet, a temperature display device detection devices.
Combustion process flow and brief description:

     The waste is a combustion chamber of the main body of the furnace. The temperature of the waste is opened by the automatic temperature control, and the combustion chamber is fully oxidized, pyrolysis and combustion in the furnace body, according to the principle of three T (temperature, time and eddy). The flue gas generated by burning into the combustion chamber two, harmful substances out of unburned flue gas in the combustion chamber for further destruction in two. In order to make unburned material completely decomposed to discharge requirements, the two combustion chambers arranged burner, the configuration of the unique secondary air supply device, in order to ensure the flue gas oxygen in the high temperature below full contact, while ensuring the flue gas in the second combustion chamber residence time and according to the second combustion chamber outlet flue gas oxygen content adjusted for the amount of wind. Two indoor temperature control and dust removal by dust removal efficiency and removal rate of more than 99%, so that no odor, no odor, no effect, to achieve national emission standards, and then into the chimney emissions to the atmosphere, after the burning of ash from artificial removal, screening, transfer and buried.
Five, the advantages of the furnace:

     Design life: the incinerator can meet the needs of all weather operation, continuous operation and uninterrupted operation, the running time of the year is not less than 8000 hours, the design life is more than 10 years.
The outer shell of the furnace body is a steel structure, the inner wall of the different properties of the refractory casting material, the inner layer is high temperature resistant castable, resistant to 1790 DEG C high temperature, intermediate for lightweight refractory material can guarantee has sufficient combustion temperature, and can keep the casing temperature, to prevent burns and refractory material material as a whole casting, not easy to fall off, is not easy to be corroded.

Honors

Cooperation Case
    1
    1
    2
    2
    3
    3
    4
    4
    5
    5
    6
    6
    7
    7
    8
    8
  • Previous:没有了
  • Next:没有了
ShanDong ZhongKeBeiTe Environmental Protection Equipment Co., Ltd. Nitto Beit Lu ICP No. 09011648
Address: Shandong Weifang Zhucheng East Outer Ring southern section of northbound Xue Hall Technical Support:ShanDong TianZe
Tel:86-0536-6085153 Fax:86-0536-6085153 E-mail:zcrdbt@126.com